It’s time for the latest Endor Studios Build video. Framing is up and approved by the inspector. Most of the exterior plywood is installed. Rough electrical is almost done. It’s all taking shape gang…
This is a post for MacSparky Labs Members only. Care to join? Or perhaps do you need to sign in?