Things are continuing to progress on the new MacSparky Studio space. In the last few days, the Inspector has green-lit going forward with drywall, stucco, and the roof. In this video, I share one last video of the interior space before drywalling begins…
This is a post for MacSparky Labs Tier 2 (Backstage) and Tier 3 (Early Access) Members only. Care to join? Or perhaps do you need to sign in?