Endor Studios Update: Ready for Drywall (MacSparky Labs)

Things are continuing to progress on the new MacSparky Studio space. In the last few days, the Inspector has green-lit going forward with drywall, stucco, and the roof. In this video, I share one last video of the interior space before drywalling begins…

This is a post for MacSparky Labs Tier 2 (Backstage) and Tier 3 (Early Access) Members only. Care to join? Or perhaps do you need to sign in?

Craft Import Automation (MacSparky Labs)

I’m moving some data into Craft, and doing it manually was driving me crazy. So I made two different Shortcuts to automate it. One is really easy, but requires a few steps by you when you run it. The second option is fancier and more complex, but does everything automatically. Enjoy!…

This is a post for MacSparky Labs Tier 2 (Backstage) and Tier 3 (Early Access) Members only. Care to join? Or perhaps do you need to sign in?